Shalkiya Zinc Ltd JSC announces about procurement of goods, works and services

Project name

Shalkiya Zinc: Pre-Privatization Loan

Country

Kazakhstan

Business sector

Natural Resources

Project ID

48347

Funding source

EBRD loan proceeds

Type of contract

Project Goods, Works and Services

Type of notice

General Procurement Notice

Issue date

03 March 2016

Closing date

03 March 2017

Shalkiya Zinc Ltd JSC (“Shalkiya”) applied to the
European Bank for Reconstruction and Development (EBRD) for a loan and intends
using the proceeds of a loan to expand capacity of the Shalkiya underground
zinc mine located in Kyzylorda region of the Republic of Kazakhstan and build a
processing plant with the annual production of 4 mln tons, at the mine site.

The Project will be implemented at Shalkiya zinc mine located in
Kyzylorda region during 2016 to 2021. The investment programme provides inter
alia for (i) design and build of a processing plant producing zinc and lead
concentrates 4 mln tons per annum (including all supporting infrastructure);
(ii) installation of the first phase crushing equipment underground and
vertical conveyor belt system for product delivery to the surface.

The proposed project has a total estimated cost of up to USD 467 million, and will
require the procurement of the following goods, works and services for:

-Turn-key EPC contract, including;

  • design and build of a
    processing plant producing zinc and lead concentrates 4 mln tons per annum (including all supporting infrastructure, tailings,
    intermediate storage of ore, conveyorto
    processing plant);
  • installation of the
    first and second phase underground crushing equipment and vertical conveyor
    belt system for product delivery to the surface;
  • onsite engineering networks;

Other goods,
works and services (not included in the EPC contract);

  • design and build of external power supply;
  • design and build of external water supply;
  • design and build of external gas supply;
  • design and build of extension of underground mine (preparatory
    and major works)
  • supply and delivery of mining and surface equipment
    (loaders, trucks, etc)
  • design and reconstruction of surface infrastructure
    buildings and facilities;
  • major underground works
    (ventilation shaft, incline conveyor, rumps, etc.);
  • research and engineering works;

– Consulting
Services to support the Client’ Project Implementation Unit (PIU).

The
procurement is expected to commence in the second quarter of 2016.

Contracts
to be financed with the proceeds of a loan from the Bank will be subject to the
Bank’s Procurement Policies and Rules and
will be open to firms from any country. The proceeds of the Bank’s loan will
not be used for the purpose of any payment to persons or entities, for any
import of goods, if such payment or import is prohibited by a decision of the
United Nations Security Council taken under Chapter VII of the Charter of the United
Nations or under a law of official regulation of the Purchaser’s country.

Interested
suppliers, contractors and consultants should contact:

ShalkiyaZinc
LTD JSC

38 Office, 4A Block, 7 Al-Farabi Avenue, Almaty city

Tel.: + 7 727 311 06 24

Contact
persons:

1. Ramazanov Bulat – Chairman of the Board

e-mail: b.ramazanov@zinc.kz

Tel.: +7 72435 22 9 13

+7 727 311
06 24

2. Sharapov Alisher – Head of Department of Economy and
Budget Planning

e-mail: a.sharapov@zinc.kz

Tel.: +7 727 311 06 24

Mob.: +7 705 987 73 93